The painting is done. In this photo, you can see the wall and the floor. Let’s look at the floor for a moment.

As you look, you see the area on the left where we removed the carpet and the pad. This allowed us to install the bottom plates for the new walls. We deliberately left the rest of the pad and carpet down while we were building. The clients are still living in the rest of the house. This controls dust and dirt during this phase and the extra soundproofing helps as well. We will be cutting it up into manageable chunks for removal.

It is time to begin installing and setting the cabinets.

Something Used, Something New

We are recycling the old cabinets that were in the old closet. We are also putting a platform for the hollow core door dividers.

We also are installing a cabinet on the right side. That one is new. One of the details that is not currently apparent is the removal of the kickspace on this project. In the closet there is really no use for it, and as the client notes, it will make cleaning easier.

The base is just loose right now. The floor is not flat. We will address that in our next episode.