Artroom Expansion 11

The electrician is on my ass! He wants to show up tomorrow morning to install the plugs and plates, because he is going on vacation. I tried vacation once. Screwed me up something fierce.

Because he is so damn good, I am taping like a cat with bacon tied to its tail. Taping is done, and tomorrow I am sanding and priming spots he needs. Like the ceiling where we are installing florescent fixtures on the ceiling.

The color variation is not your eyes or my camera. The white areas are speedset, the yellow/beige areas are USG Dust Control mud. On the left is the sub panel for the electric for this room, with circuits for the kilns, interior and exterior plugs and lights.

The wall seams are not centered as this room is only 7' high.
Artroom38

This is the east wall where the kilns will live. On the left, the square hole is for the exhaust fan. the outlet box below it is for the thermostat, that will fire it up when the kilns are running.
Artroom39

This is the south wall with the small window acting as the fresh air intake for the fan.
Artroom40

This is the west wall where the sink will be mounted. We are using an angled shower pan as the sink. Some counter and shelving will complete this wall.
Artroom41
Hopefully, I will have this painted by Sunday afternoon. Then the client will paint the floor with a two step garage paint. As I have gotten older, I have developed an extreme sensitivity to solvents,(like blinding headache, puking, wobbling around) so it is one of the remodeling tasks I no longer do.
While it is drying, like three days, I will be building cabinets and parts for the artroom as well as the sinkand counter bases.