Artroom Expansion 17

Having built or recycled a number of the elements of the artroom expansion, this is how they are coming together.
The sink area is ready for the finishing touches. The client did a great job on the floor.    Adapting a shower pan for use as a sink was a challenging project. The FRP panels were recycled from another project as was the counter. We will be installing a black ribbed rubber cover over the counter extending over the edge of the sink, forming a drain surface.
Sink6

Here is a closer look at the sink. The cap/backsplash on the left and under the window are recycled solid surface backsplashes from the Guest Bath Project. Through the window you can see the cabinets mounted that I described in my last post.
Sink7

Looking down the counter to the doorway, you can see the shelving units created for material storage.
Cab7

Here are the shelving units mounted.

Cab8 

Speaking of mounting, here are the rest of the wall cabinets mounted. After attaching the cleats, with the help of a neighbor it took almost 2 minutes to hang the cabinets.

Cab6

I did screw them through the backs into the bottom cleat, just to stablize them. We decided to add three more glass block windows over the top of this cabinet run. There is a conduit run on the outside that needs to be removed before I can cut the openings.

Meanwhile I will be cutting the rest of the deck pieces for the counter that will be installed under these cabinets.