Sponsored Links

Archives

April 2009
M T W T F S S
« Mar   May »
 12345
6789101112
13141516171819
20212223242526
27282930  

Particle Board Bathrooms – Continued

Having gotten over the weirdness of particle board as a wall material in bathrooms, the next stage of the project is bag the room again prior to sanding the walls. ( We did it once already for removing the wallpaper.The walls have to be sanded to remove bits of trash and glue left over from removing the wallpaper. Plus the fuzz from the water used getting the paper backing off the wall, and the odd bits and holes from the compound popping out from the paper removal, and the leftover silicone caulking.
There is some water staining around the base of the toilet, that will get repaired and a coat of Kilz, before priming and painting. It is remarkable how little water damage there is considering this is a bathroom. Good Wallpaper. It is also amazing how much time these two little rooms are taking.

Here I have covered the floor in Red Rosin Paper, taped and bagged the counter, toilet, and  shower. All of the towel bars, mirrors and other fixtures are sitting in the tub while I do this.

Tech Note: Remember to wipe down and vacuum the areas where your tape goes.  You get a better seal and only have to do it once. The deal is to do it right or do it over.  I don’t do over.

6a00d8345237e469e201157028f5e8970b-800wi

Having bagged, it is time to skim coat. I am using 45 min. speed set, in the belief that I would be able to skim coat,  sand and prime  this day. Silly me.
6a00d8345237e469e201157028f5e8970b-800wi

By the time I got finished skim coating these two rooms I had seriously run out of time for the day. Next up is sanding, touch up, vacuuming up the dust, caulking the inside corners,  walls and ceilings, baseboards and door trim, KILZ around the toilet, and primer.

For those of you contemplating doing a bathroom refresh by removing the wall paper and repainting, allow enough time to be able to work around surprises. For example I have around 16 hours in these two to this point. Sanding, cleaning, touch up,  caulking and priming will suck up another 6-8 hours. This is taking longer because it is smooth wall, and that is how it is done.

Comments are closed.