Lightyear Sunken Bath Episode 5 – Rough in and Glass Panel

Yesterday saw the plumber finish the rough in and test for the water lines.
Here is the shower.

6a00d8345237e469e201156fcab192970c-800wi

Here is the closet supply connection.

6a00d8345237e469e2011570bfe939970b-800wi

The electrician came and did the rough in for the bathroom and we will be pulling the wire through the ceiling tomorrow.

The glass block panels were finished early so I picked them up and installed the large one.

6a00d8345237e469e2011570bfeb45970b-800wi
Great way to do glass block, but be advised it is real heavy.