Lightyear Sunken Bath Episode 9 – Water Heater and Tub Prep 1

In our last episode I discussed blocking prior to drywalling. Since we are installing a water heaterĀ  to provide water for the Jacuzzi, and fixtures on this side of the house, which included tying in the hall bathroom (an in progress change that made sense and did not add significantly to the cost), next is getting ready for installing the water heater and setting the tub.

Coordination is important for running these projects especially when acting as your own contractor in terms of getting the professionals like the plumber and electrician to work with you. For example on this project we have an electric water heater and an electric bathtub (i.e. Jacuzzi) I choose to have both on site during this phase as if there is a problem it can be solved without everybody having to make extra trips. When the electrician installed the panel and was testing it, he discovered that one of the new breakers was bad.(It happens)

We had already partitioned the space outside of the bathroom proper to provide a space for the heater and some storage.
By Monday I had the door between the bathroom and the new water heater and storage area removed and relocated in its new location, and had three of the walls drywalled and first tape coat on.

6a00d8345237e469e201157136fe15970b-800wi
Over the weekend I tracked down a light fixture for this area as well as some other materials. Monday I framed out the opening into the storage area, drywalled the ceiling and archway, as well as the tub area.

6a00d8345237e469e201157041ef9d970c-800wi

The tub area was drywalled with M/R waterboard(green board) and screwed off. The majority of the new construction is steel stud which can’t be nailed. The f;at seams are covered with mesh tape, the inside corners are paper tape and the outside corners are covered with metal corner bead.

6a00d8345237e469e2011571373119970b-800wi

This is the long wall with our glass blocks in place, and the soffit in the foreground at the top of the photo. These openings will be wrapped with solid surface. What you can’t see in this photo is the plastic wrap that I covered the face of the blocks with. This is to make clean up easier after the soldi surface is done.

6a00d8345237e469e201157042023c970c-800wi

Here is the back tub wall drywalled. Notice the archway for the pocket door has some narrow drywall at the top and along the right side. Because this is getting a bifold door, the rough opening dimensions are narrower that a standard framed door opening.

6a00d8345237e469e20115704202f5970c-800wi

On the left side of the new archway are two electical boxes. We are
installing a Jeeves Heated Towel Bar. The bottom box is the power for
the towel bar, the upper is for the timer. They are sold separately, but if you go this route it is a good idea as it takes time to warm up and you don’t want it running all the time.

One last detail is the width of the soffit. It is 36” finished. This will provide a straight vertical line for the solid surface between the ceiling and edge of the tub when it is installed. The soffit was originally designed to carry the electricity and water lines for the tub. In discussing this with the plumber we eliminated the waterlines, which saved time and money. The electric lines are up there as it was shorter than alternatives.