The gang at One Project Closer are having their Second Annual Before and After Contest. Prizes and a Donations for Habitat for Humanity hang in the balance! Get off your ass and submit your DIY Project NOW!
|
||||
|
Before and After ![]() Before and After In our last episode I was working on the access panel for the jacuzzi. Having sorted that out, I spent time finishing up the skim coating and priming and painting in anticipation of the solid surface. ![]() Morning Light Painting is done on the soffit ceilings and the walls up to a few inches behind where the solid surface will go. ![]() ProTops lads assembling walls On the left is a portable swamp cooler as the temperature was over 100. With the canopy it is a pleasant place to work if you have to work outdoors in Arizona in the summer. The big panel has been installed and they are building the template for the back panel. They built the sides of the three glass block openings and attached them to the panel before installing it. Slid Right In. ![]() Long Wall installed. The lads are building the template for the back wall. The templating system that they use consists of 1/8” luan ply and hot melt glue to measure for the panels. Works slick. When you are working on material that has no room for error, it is important to get it right. Here is the finished product. ![]() Finished and done Here is the access panel for whoever may have to work on this in the future. ![]() Finish Access Panel It is mechanical and all mechanical things break down eventually. The guy who will have to fix this years down the road will thank me. So will the client not having to tear up the bathroom to fix a pump or leak. |
||||
|
Copyright © 2010 remodeling for geeks - All Rights Reserved |
||||
Recent Comments