Storage Project 3

In our last exciting episode we had done the demo, framed the new walls, filled in the old pocket door area, ran wiring for CATV, network, and electric.

Here is the inside of the new storage area. This is looking east.

On the left side is the pocket door opening and the new doorway framing. The door in the center of the photo leads into the house. Note the switch and push button on the left side of the door. They are the garage light and the garage door opener. Moving right, is the original wall. the two wires on it are the CATV and Network cables for the dining room.

Note the two electric boxes on the right side  wall. We removed the outlets and are covering them with blank cover plates. As it turned out, the boxes were also a feed for outlets further in the house. So after tracking and reconnecting the necessary wires we will be using blank cover plates.

Tip. If you are removing outlets or switches and not removing the boxes, Do Not Bury Them!! Wire nut  whatever connections are necessary and use blank cover plates. Make a note with a sharpie on the back explaining what they fed or/are feeding.

Moving toward the right is a dark vertical line. This is where we removed the stud on the short wall. Further right are the horizontal lines left from the shelving in the old storage room. Also note the drywall stops there and the concrete block continues. This marks the end of the house framing and the concrete block formed a wing for the front porch.

Here is the west view. On the left is our dining room wall and beyond it the concrete block wall which also turns the corner and becomes one of the garage walls.

We will be dry walling the block, patching the drywall, and skim coating the inside.  It is about half new sheetrock and half old wall with a relatively heavy texture. It is a judgment call. I can skim coat much faster than I can texture so that is the way we will go.

We have run our wiring, marked the location of the studs on the floor and ceiling,(this is so you know where to screw your drywall) and are insulating the wall. This will act as not only an energy feature but also sound control.

Drywall is up.
Here is the west garage wall where the pocket door was. Note that the right side does not extend into the storage cabinets on the right side. This is by design. It is much easier to float the mud this way and get a smooth wall.

Here is the east garage wall with the door installed. On the left are the garage light switch and the door button. In the center of the photo are two outlet boxes on top of each other. the bottom is the outlet, the top is the network and cable for the flat screen TV when this becomes a play room or man cave. In doing these projects, I always cover the outlet boxes with tape before drywall. This keeps mud and dust out of the boxes, and makes installing outlets and switches much easier if you are not excavating the boxes and the screw holes.

The new storage area.
This is looking east toward the house. The blue tape on the trim will prevent extra labor when taping and skimming that wall. The box above the new door is one of three for new energy saving florescent lights. All the flat joints are mesh tape and the corners are paper tape. The first coat is done with 90 minute ‘speed set’.

This is looking west. We have covered the block wall with drywall fastened with PowerGrab adhesive and short spiral shank masonry nails to hold the drywall as the adhesive sets.

Next post I will show some of the details of blending old and new work.